Chang-DiazFranklin Ramon |
USA |
International order nº: 204 |
US astr. nº: 125 |
|
|
| Ord. num. |
Startup spacecraft |
Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | STS-61C (Columbia/7) |
11h.55m.00s. Jan 12, 1986 |
MS | STS-61C (Columbia/7) |
13h.59m.50s. Jan 18, 1986 |
6d.02h.04m.50s. |
| 2 | STS-34 (Atlantis/5) |
16h.53m.40s. Oct 18, 1989 |
MS | STS-34 (Atlantis/5) |
16h.34m.01s. Oct 23, 1989 |
4d.23h.40m.21s. |
| 3 | STS-46 (Atlantis/12) |
13h.56m.48s. Jul 31, 1992 |
MS | STS-46 (Atlantis/12) |
13h.12m.54s. Aug 08, 1992 |
7d.23h.16m.06s. |
| 4 | STS-60 (Discovery/18) |
12h.10m.00s. Feb 03, 1994 |
MS | STS-60 (Discovery/18) |
19h.20m.13s. Feb 11, 1994 |
8d.07h.10m.13s. |
| 5 | STS-75 (Columbia/19) |
20h.18m.00s. Feb 22, 1996 |
MS | STS-75 (Columbia/19) |
13h.59m.26s. Mar 09, 1996 |
15d.17h.41m.26s. |
| 6 | STS-91 (Discovery/24) |
22h.06m.24s. Jun 02, 1998 |
MS VE-24/MIR |
STS-91 (Discovery/24) |
18h.01m.25s. Jun 12, 1998 |
9d.19h.55m.01s. |
| 7 | STS-111 (Endeavour/18) |
21h.22m.49s. Jun 05, 2002 |
MS | STS-111 (Endeavour/18) |
17h.58m.45s. Jun 19, 2002 |
13d.20h.35m.56s. |
| Total duration: | 66d 18h 23m 53s. | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 09 Jun 2002 | 15:27 UT | 7h 14m | Chang-Diaz and P.Perrin; mission "STS-111". The 7th EVA from airlock Quest. Installing a Power and Data Grapple Fixture to the station's P6 truss, to gather six micrometeorid debris shields from the shuttle cargo bay and to store them temporarily on the PMA-1; Chang-Diaz conducted a visual and photographic inspection of the failed gyroscope |
| 11 Jun 2002 | 15:20 UT | 5h 00m | Chang-Diaz and P.Perrin; mission "STS-111". The 8th EVA from airlock Quest. Completing the installation of the second component of Canada's Remote Servicing System to the ISS; they connected power and data cables to the newly installed Mobile Base System (MBS) and bolt it to the Mobile Transporter; they also relocated a TV-camera |
| 13 Jun 2002 | 15:16 UT | 7h 17m | Chang-Diaz and P.Perrin; mission "STS-111". The 9th EVA from airlock Quest. Replacing a faulty wrist-roll joint on Canadarm2 |
| Total: | 19h 31m | EVAs: 3 | |
| Ref.: #16, #21 - update: 01.07.19 | Home |