PatrickNicholas James MacDonald |
USA |
International order n°: 451 |
US astr. n°: 285 |
|
|
| N° | Startup spacecraft |
Date and time launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time
landing (UT) |
Duration |
| 1 | STS-116 (Discovery/33) |
01h.47m.35s. Dec 10, 2006 |
MS | STS-116 (Discovery/33) |
22h.32m.52s. Dec 22, 2006 |
12d.20h.45m.17s. |
| 2 | STS-130 (Endeavour/24) |
08 Feb 2010 09h.14m. |
MSP | STS-130 (Endeavour/24) |
22 Feb 2010 03h.20m. |
13d.18h.06m. |
| Total duration: | 26d 14h 51m 17s | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 12 Feb 2010 | - UT | 6h 32m | Patric and R.Behnken; mission STS-130 Removing a cover that has been in place to protect a port on the Unity node, the location where Tranquility was attached robotically halfway through the spacewalk. Next, the spacewalkers removed and stored a spare parts platform from the Special Purpose Dexterous Manipulator, or DEXTRE, a two-armed space station robot capable of handling delicate assembly tasks currently performed by spacewalkers. Finally, they installed four electronics systems cables between Unity and Tranquility to bring the new node to life. |
| 14 Feb 2010 | - UT | 5h 54m | Patric and R.Behnken; mission STS-130 Installing ammonia plumbing connectors between Unity and Tranquility and covered them with thermal insulation. When turned on, the ammonia will provide cooling to Tranquility. Then they prepared a port on the Earth-facing side of Tranquility for the flight day 8 relocation and attachment of the Cupola. |
| 17 Feb 2010 | - UT | 5h 48m | Patric and R.Behnken; mission STS-130 Turning on the ammonia cooling lines between Unity and Tranquility, installing heater and data cables on Tranquility, removing insulation and launching locks from the newly-installed Cupola, and installed handrails on the outside of Tranquility. |
| Total: | 18h 14m | EVAs: 3 | |