MorganAndrew Richard |
USA |
International order nº: 573 |
US astr. nº: 357 |
Personal data:
|
No | Launch Spacecraft | Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
1 | Soyuz MS-13 | 20 July 2019 16h 18m 21s |
FE-Exp. 60/61/62 | Soyuz MS-15 | 17 Avril 2020 05:16:10 UTC |
271d 12h 47m |
Total duration: | 271d 12h 47m |
Date | Time (UTC) of starting |
Duration | Crew & Remarks |
21 Aug 2019 | UT | 6h 32m | Morgan and N.Hague; mission ISS-Exp. The duo assisted in the installation of International Docking Adapter-3 (IDA-3) to Pressurized Mating Adapter-3 on the space-facing side of the station′s Harmony module. |
06 Oct 2019 | UT | 7h 01m | Morgan and C.Koch; mission ISS-Exp. It was the first in a series of spacewalks dedicated to replacing batteries on the far end of the station′s port truss. The existing nickel-hydrogen batteries were upgraded with newer, more powerful lithium-ion batteries. |
11 Oct 2019 | UT | 6h 45m | Morgan and C.Koch; mission ISS-Exp. The duo continued to replace nickel-hydrogen batteries with more powerful lithium-ion batteries (working site: P6 Channel 2B battery R&R A-F). |
15 Nov 2019 | UT | 6h 39m | Morgan and L.Parmitano; mission ISS-Exp. It was the first in a series of complex spacewalks in November and December 2019 to repair the Alpha Magnetic Spectrometer (AMS-02). They set up tools and equipment before removing a protective debris shield from the AMS-02, giving them access to the guts of the instrument so a new coolant system pump module can be installed later. |
22 Nov 2019 | UT | 6h 33m | Morgan and L.Parmitano; mission ISS-Exp. They continued their work to replace a cooling system and fixed a coolant leak on AMS-02. Luca Parmitano and Andrew Morgan cut and label stainless steel tubes, of which there are eight. |
02 Dec 2019 | UT | 6h 02m | Morgan and L.Parmitano; mission ISS-Exp. Today′s main task was to install a new pump module. The astronauts installed a bypass to the old thermal control system by attaching a new one off the side of AMS-02. |
25 Jan 2020 | UT | 6h 16m | Morgan and L.Parmitano; mission ISS-Exp. The main task was to carry out leak checks, make adjustments and then to re-installed insulation on AMS-02. |
Total: | 45h 48m | EVAs: 7 |
No. | Mission | Job | Date |
1 | Soyuz MS-11 | Flight Engineer | 03 Dec 2018 |
2 | Soyuz MS-12 | Flight Engineer | 14 Mar 2019 |
Ref.: #16 - update: 05.04.20 | Home |