2014-017 |
PSLV-XL |
US |
Fully integrated PSLV-C24 Core Stage on the launch platform inside the Mobile Service Tower |
One of the Strap-ons being integrated with PSLV-C24 Core Stage at Mobile Service Tower |
PSLV-C24 Strap-Ons are being assembled with Core Stage |
PSLV-C24 Second Stage in the Stage Preparation Facility |
IRNSS-1B being integrated with PSLV-C24 |
IRNSS-1B being integrated with PSLV-C24 |
The two halves of PSLV-C24 Payload Fairing enclosing the IRNSS-1B on the 4e Stage |
MST withdrawal exercise during launch rehearsal |
PSLV-C24 Take Off |
Launch vehicle: | PSLV-XL |
Launch vehicle ID: | C24 |
Payload: | IRNSS 1B |
Launch date: | 04 April 2014 |
Launch site: | Sriharikota, FLP |