ISRO launch rockets

India



Indian founded its space agency ISRO in 1969 and then a Ministry of Space in 1972. The next step was to decide to build a national space launcher.

SLV 3 (Satellite Launch Vehicle) and ASLV (Advanced SLV):


SLV 3 was a 4-stage solid-fuel light launcher (polybutadiene). It was 17.8 tons and 22.7 m high with a 1 m diameter max. Its payload mass in circular 500 km orbit was around 40 kg.

The first stage was 9 m high; it delivered 420 kN t (sea level) thrust during 53 seconds. The second stage (80 cm diameter) operated during 42 seconds and provided 200 kN thrust. The third stage (same diameter as stage 2) was fired for 46 seconds and delivered over 60 kN thrust. The 4th stage (65 cm diameter) was fired for 30 seconds and provided about 22 kN thrust. Two ballistic phases occured during the flight: one after second stage shutdown (until 88 km altitude) and after third stage shutdown (to reach perigee altitude).

Rockets were launched from the Sriharikota base on the Indian East coast. This site is operational since the success of a RH-125 sounding rocket in October 1971. After a first attempt which failed in August 1979 the SLV 3 rocket orbited 3 little Rohini scientific satellites in July 1980, Mai 1981 and April 1983. Then the launcher was abandonned for the ASLV.

ASLV was dirived from SLV 3 by the addition of two boosters which dimensions and performances were similar to those of the first stage. Those boosters provided the takeoff of the vehicle by providing each 440 kN thrust during 49 seconds. This caused the first stage to be modified to operate in the air. ASLV was 24 m high and its capacity reached 150 kg payload in LEO (40 km).

The first two launches were failures in March 1987 and July 1988. Then ASLV orbited two SROSS satellites in May 1992 and May 1994.

Noticeable is the fact the the first stage of the SLV 3 was used from 1989 on as first stage of the experimental Agni IRBM (2500 km range). This is perhaps a unique example of transfert of a civilian stage to a military application.

PSLV (Polar Satellite Launch Vehicle):


PSLV is a 4-stage launcher measuring 44 m high for 2.8 m diameter max, weighing 275 tons.It can orbit around 1 ton payload in sun-synchronous polar orbit.

The first stage is 20 m high and weighs 129 tons. It is powered by a solid fuel motor (HTPB: Hydroxyl-Terminated PolyButadiene) which burns during 100 seconds and provides 3500 kN thrust at sea level (4600 kN in vacuum). It is supported by 6 boosters --switched on by group of two then four-- derived from the SLV 3 and ASLV first stage. Each of those deliver 440 kN thrust at sea level (660 kN in vacuum). The second stage is 11 m high for 2.8 m diameter and weighs 38 tons. Its Vikas motor --built under French SEP licence-- consumes liquid propellant (nitrogen tetraoxide and UDMH: Unsymmetrical DiMethylHydrazine). It provides 725 kN thrust during 150 seconds. The third stage is 3.5 m high and 2 m diameter; it weighs 7 tons. Its solid fuel motor (HTPB) provides 340 kN thrust. The fourth stage protected by a bulb cap is 2.6 m long by 1.34 m diameter. It is propulsed by 2 ergols motors (peroxyde d'azote and MMH: MonoMethylHydrazine) of 7.5 kN thrust each which burn during about 7 minutes.

The first launch failed in Sep 1993 because of a software problem in the guidance system. The second launch in Oct 1994 orbited IRS P2. The next flights are scheduled every 12 to 18 months for the IRS remote sensing satellites.

Notes:

SLV-3, ASLV, PSLV & GSLV launches: see tables.
All launches from Sriharikota (2100 km southeast of New Dehli)