STS-115

USA


Manned Flight nº: 249

Earth orbit Flight nº: 246

USA manned Flight nº: 147

31th manned flight to ISS. - Flight: ISS-19-12A

Launch, orbit & landing data:

Designation 29391 / 06036A
Launch date - time 09 Sep 2006 - 15:14:55 UT
Launch site KSC, LC39B
Launch vehicle  Space Shuttle (#116)
Orbiter Atlantis #27
Primary payload ITS-P3/4
Mass (kg) 
Docking date - time 11 Sep 2006 - 10:48 UT
Target spacecraft/port ISS/xx
Earth orbit :
   - Perigee / Apogee 229 x 285 km
   - Inclination 51.6°
   - Period 89.6 min
Undocking date - time 17 Sep 2006 - 12:50 UT
Landing date - time
(wheel stop)
 21 Sep 2006 - 10:22:16 UT
Rollout time 46 sec
Landing location KSC, runway 33
Flight Duration (d:hr:min) 11d 19h 07m 21s
Nbr orbits 186
Landing crew 
 (crew S-)


Flight Crew

Nr. Surname Given name Job Duration
1  Jett  Brent  CDR  11d 19h 07m 21s
2  Ferguson  Christopher  PLT  11d 19h 07m 21s
3  Burbank  Daniel  MSP  11d 19h 07m 21s
4  Tanner  Joseph  MSP  11d 19h 07m 21s
5  MacLean  Steven  MSP, Canada  11d 19h 07m 21s
6  Stefanyshyn-Piper  Heidemarie  MSP  11d 19h 07m 21s

Summary:

ISS-19-12A P3/P4 Arrays.
Delivery of supplies to ISS. Delivery and mounting of solar array truss P3/P4.

Mission report:

For the second time, the crew of STS-115 walks to the Astro-Van for the 20 minute trip to Pad 39B.
Credit: W.G.Hartenstein


Astrophilately covers:

STS-115

Launch cancel KSC. Credit: J. Vd Dr.

STS-115

Landing cancel KSC. Credit: J. Vd Dr.



Ref.: #7(JR570/571), #16, #21, #79, #415 - update: 14.04.19 Home