Ross

Jerry Lynn

USA


International order n°: 194

US astr. n°: 116


Personal data:

Birthdate:  20 Jan 1948
Birthplace:  Crown Point / Indiana
Marital status:  married
Children:  two
Selection date:  19 May 1980
Selection group:  NASA-9
Job:  MSP
Status:  Ret. 20 Jan 2012

Spaceflights:

Launch
spacecraft
Date and time
launch (UT)
Status
while
launch
Landing
Spacecraft
Date and time
landing (UT)
Duration
1 STS-61B
(Atlantis/2)
00h.29m.00s.
Nov 27, 1985
MS STS-61B
(Atlantis/2)
21h.35m.07s.
Dec 03, 1985
6d.21h.06m.07s.
2 STS-27
(Atlantis/3)
14h.30m.34s.
Dec 02, 1988
MS STS-27
(Atlantis/3)
23h.36m.54s.
Dec 06, 1988
4d.09h.06m.20s.
3 STS-37
(Atlantis/8)
14h.22m.45s.
Apr 05, 1991
MS STS-37
(Atlantis/8)
13h.56m.25s.
Apr 11, 1991
5d.23h.33m.40s.
4 STS-55
(Columbia/14)
14h.50m.00s.
Apr 26, 1993
MS STS-55
(Columbia/14)
14h.31m.00s.
May 06, 1993
9d.23h.41m.00s.
5 STS-74
(Atlantis/15)
12h.30m.43s.
Nov 12, 1995
MS
VE-14/MIR
STS-74
(Atlantis/15)
17h.02m.25s.
Nov 20, 1995
8d.04h.31m.42s.
6 STS-88
(Endeavour/13)
08h.35m.34s.
Dec 04, 1998
MS STS-88
(Endeavour/13)
03h.54m.21s.
Dec 16, 1998
11d.19h.18m.47s.
7 STS-110
(Atlantis/25)
20h.44m.19s.
Apr 08, 2002
MS STS-110
(Atlantis/25)
16h.28m.07s.
Apr 19, 2002
10d.19h.43m.48s.
Total duration: 58d 01h 01m 24s


EVA′s:

Date of
beginning
Time (UT) of
beginning
Duration Explanation
29 Nov 1985 ? 5h 32m S.Spring and Ross; mission "STS-61B" - Building of EASE and ACCESS without RMS
01 Dec 1985 ? 6h 38m S.Spring and >Ross; mission "STS-61B" - Building of EASE and ACCESS using the RMS
07 Apr 1991 ? 4h 24m Ross and J.Apt; mission "STS-37" - Deploying the large radio antenna of the GRO
08 Apr 1991 ? 6h 11m Ross and J.Apt; mission "STS-37" - Testing concepts for getting around the large space structures using CETA
07 Dec 1998 22:10 7h 21m Ross and J.Newman; mission "STS-88" - Installation cable from Unity to Zarya-module
09 Dec 1998 20:33 7h 02m Ross and J.Newman; mission "STS-88" - Mounting tools, unfolding solar cell structure
12 Dec 1998 20:33 6h 59m Ross and J.Newman; mission "STS-88" - Mounting restraints, using SAFER
13 Apr 2002 14:09 7h 30m Ross and L.Morin; mission "STS-110". The 4th EVA from airlock Quest.
Mounting two large tripod legs of the truss to the Destiny Laboratory.
16 Apr 2002 14:29 6h 37m Ross and L.Morin; mission "STS-110". The 6th EVA from airlock Quest.
Installing a ladder, testing electrical switches for upcoming truss expansion and attaching external light and equipment to be used in future assembly work.
Total: 58h 14m EVAs: 9

Additional information


Ref: #16, #21 - update: 13.05.18