Kopra

Timothy Lennart

USA


International order n°: 502

US astr. n°: 324


Personal data:

Birthdate:  09.04.1963
Birthplace:  Austin / Texas
Marital status:  married
Children:  two
Selection date:  26.07.2000
Selection group:  NASA-18
Job:  MSP
Status:  active

Spaceflights:

Ord.
num.
Startup
spacecraft
Date and time
launch (UT)
Status while
launch
Spacecraft
of landing
Date and time
landing (UT)
Duration
1 STS-127
(Endeavour/23)
15 Jul 2009
22h.03m.
MSP STS-128
(Atlantis/31)
12 Sep 2009 58d 02h 50m
Total duration: 58d 02h 50m

EVA's

Date of
beginning
Time of
beginning
Duration Crew & Remarks
18 July 2009 - UT 5h 32m Kopra and D.Wolf; mission STS-127
Prepare connecting mechanisms for Kibo and the exposed facility, which the station's robotic arm will install later in the day. They also released bolts on an ammonia tank assembly as get-ahead work for the next shuttle mission, STS-128. Then, both worked to deploy the unpressurized cargo carrier attachment system (UCCAS) on the Port 3 truss that was jammed and couldn't be done on STS-119. The UCCAS will be used in the future to store equipment and supplies on the outside of the station.
Total: 5h 32m EVAs: 1

Backup assignments

No. Mission Job Date
1  STS-123  Flight Engineer  
2  STS-124  Flight Engineer  May 2008

Additional information


Ref: #16 - update: 10.02.11