Caldwell - DysonTracy Ellen |
USA |
International order nº: 467 |
US astr. nº: 299 / W-47 |
|
|
| No | Launch Spacecraft | Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | STS-118 (Endeavour/20) |
08 Aug 2007 22h.36m.42s. |
MSP | STS-118 (Endeavour/20) |
21 Aug 2007 16h.33m.20s. |
12d.17h.55m. |
| 2 | Soyuz TMA-18 (ISS-23/24 crew) |
02 Apr 2010 04h.04m. |
Flight Engineer | Soyuz TMA-18 | 25 Sep 2010 05:23 UT |
176d 01h 18m |
| 3 | Soyuz MS-25 (ISS-70/71 crew) |
23 Mars 2024 - |
Flight Engineer | Soyuz MS-25 | 23 Sep 2024 - |
183d 23h 22m |
| Total duration: | 372d.18h.35m. | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 07.08.2010 | - UT | 8h 03m | Dyson and D.Wheelock, station "ISS" They started disconnecting umbilicals from the broken space station coolant pump. However, difficulty unplugging one of the ammonia lines consumed a couple of hours and a leak seen from that connector once it finally cooperated prevented the astronauts from progressing any further in their work. |
| 11.08.2010 | - UT | 7h 26m | Dyson and D.Wheelock, station "ISS" Removing the old pump and stowing it on the Mobile Base System on the station's truss while preparing the replacement pump for its removal from a stowage platform adjacent to the Quest airlock and its installation on the truss during a third spacewalk. |
| 16.08.2010 | - UT | 7h 20m | Dyson and D.Wheelock, station "ISS" Installation of a spare ammonia pump module on the S1 Truss. |
| 24.06.2024 | - UT | 0h 31m | Dyson and M.Barratt, station "ISS" NASA says today's spacewalk lasted due to a water leak only 31 minutes; that's the time between the switch to battery power and the moment the crew reconnected to station power. |
| Total: | 23h 20m | EVAs: 4 | |
| Nº. | Mission | Position | Date |
| 1 | Soyuz MS-24 | Flight Engineer |
|
| Ref.: #7, #16, #21, #215a - update: 13.11.25 | Home |