Posat 1 |
Portugal |
Spacecraft n°: |
Portuguese spacecraft n°: 1 |
| Designation | 22829 / 93061G |
| Launch date | 25 Sep 1993 |
| Launch site | Ko, ELA-2 |
| Launch vehicle | Ariane-40 (V59) |
| Mission | Communications |
| Sun-Synchronous LEO orbit: | |
| Perigee / Apogee | 790 x 806 km |
| Eccentricity | 1.12E-03 |
| Inclination | 98.6 deg |
| Period | 100.83 min |
| Prime contractor | SSTL (Surrey Satellite Technology Ltd.) |
| Platform | SSTL |
| Operator | Consorcio Po-SAT of the LNETI (Laboratorio Nacional de Engenhario e Technologia Industrial) |
| Mass at launch | 50.5 kg |
| Dry Mass | 50 kg |
| Length | 352 mm |
| Width | 356 mm |
| Height | 670 mm |
| Stabilization | gravity gradient |
| DC power | 10 W (EOL) |
| Design lifetime | 5 years |
| Downlink freq. | Transponder/Beacon | Mode |
| 145.975 | JD 9600 bps FSK (Primary) | |
| 145.925 | JD 9600 bps FSK (Secondary) |
| Uplink freq. | Transponder/Beacon | Mode |
| 435.075 | JD 9600 bps FSK (Primary) | |
| 435.050 | JD 9600 bps FSK (Secondary) |