Total project cost: $171 million including $120 million for the satellite.
Funded by NASA. French and Canadian space agency share observation time. French
CNES paid 6 million EUR.
Specifications
Prime
contractor
OSC
Platform
Mass
at launch
1360
kg
Mass
in orbit
Dimension
1.2
x 1.8 x 5.5 m
Solar
array
Stabilization
DC
power
Design
lifetime
3
years
A Boeing Delta 7320 launch vehicle with a 3-m payload fairing was
used to place FUSE in a 754 x 769 km x 25.0 deg orbit. The Delta second
stage then made a depletion burn and was left in a 182 x 915 km x 19.1
deg orbit. FUSE carries four 0.35m far ultraviolet telescopes each with
an ultraviolet high resolution spectrograph. The detectors cover the far
ultraviolet band from the hydrogen ionization edge at 912A (Angstrom) to
1187A, just short of the Lyman alpha line at 1215A. For comparison,
Hubble starts operating just longward of this wavelength. The far UV
spectra will measure the abundance of deuterium in the universe, as well
as study helium absorption in the intergalactic medium, hot gas in the
galactic halo traced by lines like Oxygen VI at 1034A, and cold gas in
molecular clouds from molecular hydrogen lines. Checkout of FUSE
in orbit was proceeding well as of July 1.
Ref: #7(SR402) - #15, #27 - update: 15.07.04