2014-017 |
PSLV-XL |
US |
![]() Fully integrated PSLV-C24 Core Stage on the launch platform inside the Mobile Service Tower |
![]() One of the Strap-ons being integrated with PSLV-C24 Core Stage at Mobile Service Tower |
![]() PSLV-C24 Strap-Ons are being assembled with Core Stage |
![]() PSLV-C24 Second Stage in the Stage Preparation Facility |
![]() IRNSS-1B being integrated with PSLV-C24 |
![]() IRNSS-1B being integrated with PSLV-C24 |
![]() The two halves of PSLV-C24 Payload Fairing enclosing the IRNSS-1B on the 4e Stage |
![]() MST withdrawal exercise during launch rehearsal |
![]() PSLV-C24 Take Off |
| Launch vehicle: | PSLV-XL |
| Launch vehicle ID: | C24 |
| Payload: | IRNSS 1B |
| Launch date: | 04 April 2014 |
| Launch site: | Sriharikota, FLP |