STS-84

USA


Manned Flight nº: 198

Earth orbit Flight nº: 195

USA manned Flight nº: 115

6nd Shuttle docking with Mir

Launch, orbit & landing data:

Designation 24804 / 97023A
Launch date - time 15 May 1997 - 08:07:48 UT
Launch site KSC, LC39A
Launch vehicle  Space Shuttle
Orbiter Atlantis #19 (OV-104)
Primary payload Spacehab SH-08
Mass (kg) 
Flight Crew Precourt, Collins, Clervoy, Noriega
Lu, Kondakova, Foale
Russia backup crew Titov Vladimir
Docking date - time 17 May 1997 - 02:33 UT
Target spacecraft/port Mir/SO module
Earth orbit on :
   - Perigee / Apogee 377 / 393 km
   - Inclination 51.7°
   - Period 92.3 min
Undocking date - time 22 May 1997 - 01:04 UT
Landing date - time 24 May 1997 - 13:27:44 UT
Landing location KSC, Runway 33
Flight Duration (d:hr:min) 9d 05h 20m
Nbr orbits 145
Landing crew Precourt, Collins, Clervoy, Noriega,
Lu, Kondakova, Linenger
 (crew STS-84 & STS-81)

Foale landed with STS-86 on 6 Oct 1997 (2291 orbits)

Crew

Nr. Surname Given name Job Duration
1  Precourt  Charles Joseph  CDR 9d 05h 20m 
2  Collins  Eileen Marie  PLT 9d 05h 20m 
3  Foale  Colin Michael  MSP 144d 13h 48m 
4  Noriega  Carlos Ismael  MSP 9d 05h 20m 
5  Lu  Edward Tsang  MSP 9d 05h 20m 
6  Clervoy  Jean-François  MSP (ESA) 9d 05h 20m 
7  Kondakova  Yelena Vladimirovna  MSP (RKA) 9d 05h 20m 

Mission details:

Spacehab-DM onboard; docking on Mir and common flight on nearly 5 days; testing of a new developed docking-maneuver; 3 tons of supplies were transferred (including a new oxygen-aparature); Foale replaced Linenger onboard the MIR.

Astrophilately covers:

STS-84

Launch cancel KSC.

Landing cancel KSC.



Ref.: #7(JR322-323), #8, #16 - update: 08.05.19 Home