STS-28

USA


Manned Flight nº: 126

Earth orbit Flight nº: 123

USA manned Flight nº: 61


Launch, orbit & landing data:

Designation 20164 / 89061A
Launch date - time 08 Aug 1989 - 12:37:00 UT
Launch site KSC, LC39B
Launch vehicle  Space Shuttle
Orbiter Columbia OV-102 (#8)
Primary payload USA-40 / USA-41
Mass (kg) 
Flight Crew Shaw, Richards, Adamson
Leestma, Brown
Call Sign 
Earth orbit on :
   - Perigee / Apogee  km
   - Inclination 57.0°
   - Period  min
Landing date - time 13 Aug 1989 - 13:37:08 UT
Landing location Edwards AFB, Runway 17
Flight Duration (d:hr:min) 5d 01h 00m
Nbr orbits 81

Crew

Nr. Surname Given name Job Duration
1  Shaw  Brewster Hopkinson, Jr.  CDR 5d 01h 00m 
2  Richards  Richard Noel  PLT 5d 01h 00m 
3  Adamson  James Craig  MSP 5d 01h 00m 
4  Leestma  David Cornell  MSP 5d 01h 00m 
5  Brown  Mark Neil  MSP 5d 01h 00m 

Mission details:



08 August 1989 12:43 GMT. Duration: 5.04 days. Call Sign: Columbia. LV Configuration: STS-28R. Payload: Columbia F08 / DoD. Perigee: 289 km. Apogee: 306 km. Inclination: 57.0 deg. Period: 90.5 min.
STS-28 STS-28 - STS-28 Columbia, OV-102, Pilot Richards adjusts LES before bailout exercises - Credit: NASA.

Manned five crew. Deployed 2 classified satellites. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 287 kph. Touchdown miss distance: 1,618.00 m. Landing Rollout: 1,833.00 m. Payloads: DoD Mission.


STS-28STS-28 - STS-28 Columbia, OV-102, lifts off from KSC Launch Complex (LC) Pad 39B - Credit: NASA.

NASA Official Mission Narrative

Mission Name: STS-28 (30)
COLUMBIA (8)
Pad 39-B (11)
30th Shuttle mission
8th Flight OV-102

Crew:
Brewster H. Shaw, Jr. (3), Commander
Richard N. Richards (1), Pilot
James C. Adamson (1), Mission Specialist 1
David C. Leestma (2), Mission Specialist 2
Mark N. Brown (1), Mission Specialist 3


STS-28STS-28 - STS-28 Columbia, OV-102, Pilot Richards at forward flight deck pilots station - Credit: NASA. 61,628 bytes. 620 x 620 pixels.

Milestones:
OPF - Jan. 23, 1989
VAB - July 3, 1989
PAD - July 14,1989

Payload:
DoD(4)
Mission Objectives:

Launch:
August 8, 1989, 8:37:00 a.m. EDT. Liftoff occurred during classified launch window lying within launch period extending from 7:30 a.m. to 11:30 a.m. EDT, Aug. 8. Launch Weight: Classified.
Orbit:
Altitude: Classified
Inclination: 57.0 degrees
Orbits: 81
Duration: 5 days, 1 hour, 0 minutes, 8 seconds.
Distance: 2,100,000 miles (approx)


STS-28STS-28 - STS-28 Columbia, OV-102, MS Brown juggles food containers on middeck - Credit: NASA.

Hardware:
SRB: BI-028
SRM: 360H005
ET : 31/LWT-24
MLP : 2
SSME-1: SN-2019
SSME-2: SN-2022
SSME-3: SN-2028

Landing:
August 13, 1989, 6:37:08 a.m. PDT, Runway 17, Edwards Air Force Base, Calif. Rollout distance: 6,015 feet. Rollout time: 46 seconds. Orbiter returned to KSC Aug. 21, 1989. Landing Weight: 200,214 lbs.


STS-28STS-28 - STS-28 Columbia, OV-102, MS Brown uses ARRIFLEX camera on aft flight deck - Credit: NASA.

Mission Highlights:
Fourth mission dedicated to Department of Defense, and first flight of COLUMBIA since Mission 61-C.
STS-28 STS-28 - STS-28 Columbia, OV-102, landing at Edwards Air Force Base (EAFB) California - Credit: NASA.


STS-28 STS-28 - STS-28 MS Adamson inspects Columbia′s, OV-102's, thermal protection system - Credit: NASA.


Astrophilately covers:

STS-28

Launch cancel Houston.



Ref.: #1, #7(JR19,22), #8, #16 - update: 18.03.19 Home