Russian spacewalks till end of Mir (12 May 2000)

Russia



Details of all Russian spacewalks up to Mir, noting the spacesuit numbers used during each one.

Voshkod-2

Date Duration Participants & spacesuit numbers Spacesuit name Tasks & notes
18 Mar 1965 0h 12m Aleksei Leonov Berkut First spacewalk

Soyuz-5/Soyuz-4

Date Duration Participants & spacesuit numbers Spacesuit name Tasks & notes
16 Jan 1969 0h 37m
  • Aleksei Yeliseyev
  • Evgenii Khrunov
Yastreb External transfer from Soyuz 5 to Soyuz 4

Salyut-6

Date Duration Participants & spacesuit numbers Spacesuit name Tasks & notes
19 Dec 1977 1h 28m
  • Yurii Romanenko, N°33
  • Georgii Grechko, N°34
Orlan-D Inspection of the nose docking adapter
29 Jul 1978 2h 5m
  • Vladimir Kovalyonok, N°33
  • Aleksandr Ivanchenkov, N°34
Orlan-D Recovery of tools and experiments
15 Aug 1979 1h 23m
  • Vladimir Lyakhov, N°33
  • Valerii Ryumin, N°34
Orlan-D Restore damaged KRT-10 antenna

Salyut-7

Date Duration Participants & spacesuit numbers Spacesuit name Tasks & notes
30 Jul 1982 2h 33m
  • Anatolii Berezovoi, N°45
  • Valentin Lebedev, N°46
Orlan-D Recovery of tools and experiments
1 Nov 1983 2h 49m
  • Vladimir Lyakhov, N°45
  • Aleksandr Aleksandrov, N°46
Orlan-D Installation of a supplied solar cell
3 Nov 1983 2h 55m
  • Vladimir Lyakhov, N°45
  • Aleksandr Aleksandrov, N°46
Orlan-D Installation of a second supplied solar cell
23 Apr 1984 4h 15m
  • Leonid Kizim, N°45
  • Vladimir Solovâyov, N°47
Orlan-D Preparations of repairing work
26 Apr 1984 4h 56m
  • Leonid Kizim, N°45
  • Vladimir Solovâyov, N°47
Orlan-D Repairing of fuel-pipeline
29 Apr 1984 2h 45m
  • Leonid Kizim, N°45
  • Vladimir Solovâyov, N°47
Orlan-D Repairing of fuel-pipeline
3-4 May 1984 2h 45m
  • Leonid Kizim, N°45
  • Vladimir Solovâyov, N°47
Orlan-D Repairing of fuel-pipeline
18 May 1984 3h 5m
  • Leonid Kizim, N°45
  • Vladimir Solovâyov, N°47
Orlan-D Installation of a third and fourth supplied solar cell
25 Jul 1984 3h 35m
  • Vladimir Dzhanibekov, N°47
  • Svetlana Savitskaya, N°45
Orlan-D Testing URI-tool, first female spacewalk
8 Aug 1984 5h 0m
  • Leonid Kizim, N°45
  • Vladimir Solovyov, N°47
Orlan-D Final repair of fuel pipeline
2 Aug 1985 5h 0m
  • Vladimir Dzhanibekov, N°10
  • Viktor Savinykh, N°8
Orlan-DM Installation of a 5. and 6. supplied solar cell
28 May 1986 3h 50m
  • Leonid Kizim, N°10
  • Vladimir Solovyov, N°8
Orlan-DM Building large structures, recovery of experiments
31 May 1986 5h 2m
  • Leonid Kizim, N°10
  • Vladimir Solovyov, N°8
Orlan-DM Building large structures, recovery of experiments

Mir

Date Duration Participants & spacesuit numbers Spacesuit name Tasks & notes
11 Apr 1987 3h 40m
  • Yurii Romanenko, N°7
  • Aleksandr Laveikin, N°9
Orlan-DM Working on docking adapter
12 Jun 1987 1h 53m
  • Yurii Romanenko, N°7
  • Aleksandr Laveikin, N°9
Orlan-DM Installation of a solar cell structure (2 cells)
16 Jun 1987 3h 15m
  • Yurii Romanenko, N°7
  • Aleksandr Laveikin, N°9
Orlan-DM Finishing work on solar cell structure
26 Feb 1988 4h 25m
  • Vladimir Titov, N°7
  • Musa Manarov, N°9
Orlan-DM Replacing a solar cell element on Mir
30 Jun 1988 5h 10m
  • Vladimir Titov, N°7
  • Musa Manarov, N°9
Orlan-DM Repairing of Röntgen-telescope in Kvant-1 module
20 Oct 1988 4h 12m
  • Vladimir Titov, N°6
  • Musa Manarov, N°10
Orlan-DMA Finishing repairing, building of a platform
9 Dec 1988 6h 10m
  • Aleksandr Volkov, N°6
  • Jean-Loup Chrétien, N°10
Orlan-DMA Mounting of ERA, exchange of experiments
8 Jan 1990 2h 56m
  • Aleksandr Viktorenko, N°6
  • Aleksandr Serebrov, N°10
Orlan-DMA Mounting of tools, recovery of experiments
11 Jan 1990 2h 54m
  • Aleksandr Viktorenko, N°6
  • Aleksandr Serebrov, N°10
Orlan-DMA Mounting and rebuilding of tools and segments
26 Jan 1990 3h 2m
  • Aleksandr Viktorenko, N°12
  • Aleksandr Serebrov, N°8
Orlan-DMA Building a platform for SPK Ikar on Kvant-2 module
1 Feb 1990 4h 59m
  • Aleksandr Viktorenko, N°12
  • Aleksandr Serebrov, N°8
Orlan-DMA First testing of SPK Ikar (Serebrov)
5 Feb 1990 3h 45m
  • Aleksandr Viktorenko, N°12
  • Aleksandr Serebrov, N°8
Orlan-DMA Second testing of SPK Ikar (Viktorenko)
17 Jul 1990 7h 16m
  • Anatolii Solovyov, N°12
  • Aleksandr Balandin, N°8
Orlan-DMA Repairing thermo-isolation of spacecraft
26 Jul 1990 3h 31m
  • Anatolii Solovyov, N°12
  • Aleksandr Balandin, N°8
Orlan-DMA Searching of the leak in Kvant-2 module
29-30 Oct 1990 3h 45m
  • Gennadii Manakov, N°12
  • Gennadii Strekalov, N°10
Orlan-DMA Repairing of Kvant-2 hatch (failed)
7 Jan 1991 5h 18m
  • Viktor Afanasyev, N°6
  • Musa Manarov, N°10
Orlan-DMA Repairing of Kvant-2 hatch
23 Jan 1991 5h 4m
  • Viktor Afanasyev, N°6
  • Musa Manarov, N°10
Orlan-DMA Mounting the first Strela crane on Mir
26 Jan 1991 6h 20m
  • Viktor Afanasyev, N°6
  • Musa Manarov, N°10
Orlan-DMA Mounting of restraints for solar cells
25-26 Apr 1991 3h 34m
  • Viktor Afanasyev, N°6
  • Musa Manarov, N°10
Orlan-DMA Inspection of failed Kurs antenna
24-25 Jun 1991 4h 58m
  • Anatolii Artsebarskii, N°6
  • Sergei Krikalyov, N°14
Orlan-DMA Replace of the Kurs antenna
28 Jun 1991 3h 24m
  • Anatolii Artsebarskii, N°6
  • Sergei Krikalyov, N°14
Orlan-DMA Mounting of experiments/TV-camera
15 Jul 1991 5h 45m
  • Anatolii Artsebarskii, N°6
  • Sergei Krikalyov, N°8
Orlan-DMA Building platform for the Sofora mast
19 Jul 1991 5h 28m
  • Anatolii Artsebarskii, N°6
  • Sergei Krikalyov, N°8
Orlan-DMA Mounting Sofora mast on Kvant-1 module
23 Jul 1991 5h 34m
  • Anatolii Artsebarskii, N°6
  • Sergei Krikalyov, N°8
Orlan-DMA Mounting Sofora mast on Kvant-1 module
27 Jul 1991 6h 49m
  • Anatolii Artsebarskii, N°6
  • Sergei Krikalyov, N°8
Orlan-DMA
  • Mounting Sofora mast on Kvant-1 module
  • Hoisting the State Banner
20-21 Feb 1992 4h 12m
  • Aleksandr Volkov, N°12
  • Sergei Krikalyov, N°8
Orlan-DMA Dismantle platform, recovery of experiments
8 Jul 1992 2h 3m
  • Aleksandr Viktorenko, N°15
  • Aleksandr Kaleri, N°14
Orlan-DMA Repairing work on gyroscopic stabilizer
3 Sep 1992 3h 56m
  • Anatolii Solovyov, N°15
  • Sergei Avdeev, N°14
Orlan-DMA Preparing VDU mounting
7 Sep 1992 5h 08m
  • Anatolii Solovyov, N°15
  • Sergei Avdeev, N°14
Orlan-DMA
  • VDU-mounting
  • Re-hoisting the State Banner
11 Sep 1992 5h 44m
  • Anatolii Solovyov, N°15
  • Sergei Avdeev, N°14
Orlan-DMA VDU-mounting, tearing out the VDU
15 Sep 1992 3h 33m
  • Anatolii Solovyov, N°15
  • Sergei Avdeev, N°14
Orlan-DMA Mounting a Kurs antenna on the Kristall module
19 Apr 1993 5h 25m
  • Gennadii Manakov, N°15
  • Aleksandr Poleshchuk, N°14
Orlan-DMA Mounting restraints for solar cells
18 Jun 1993 4h 33m
  • Gennadii Manakov, N°15
  • Aleksandr Poleshchuk, N°14
Orlan-DMA Repairing crane, mounting restraints
16 Sep 1993 4h 18m
  • Vasilii Tsibliyev, N°25
  • Aleksandr Serebrov, N°14
Orlan-DMA Preparing Rapana-mounting
20 Sep 1993 3h 13m
  • Vasilii Tsibliyev, N°25
  • Aleksandr Serebrov, N°14
Orlan-DMA Preparing Rapana-mounting
28 Sep 1993 1h 52m
  • Vasilii Tsibliyev, N°25
  • Aleksandr Serebrov, N°14
Orlan-DMA Repairing of a valve, movie documentation
22 Oct 1993 0h 38m
  • Vasilii Tsibliyev, N°25
  • Aleksandr Serebrov, N°14
Orlan-DMA Movie documentation
29 Oct 1993 4h 12m
  • Vasilii Tsibliyev, N°25
  • Aleksandr Serebrov, N°18
Orlan-DMA Movie documentation, Sofora inspection
9 Sep 1994 5h 4m
  • Y. Malenchenko, N°25
  • Talgat Musabayev, N°18
Orlan-DMA Repairing of Kristall-isolation
13 Sep 1994 6h 1m
  • Y. Malenchenko, N°25
  • Talgat Musabayev, N°18
Orlan-DMA Preparation work for new setting of solar cells
12 May 1995 6h 15m
  • Vladimir Dezhurov, N°27
  • Gennadii Strekalov, N°18
Orlan-DMA Preparation work for new setting of solar cells
17 May 1995 6h 52m
  • Vladimir Dezhurov, N°27
  • Gennadii Strekalov, N°18
Orlan-DMA Changing Kristall solar cell to Kvant-1 module
22 May 1995 5h 15m
  • Vladimir Dezhurov, N°27
  • Gennadii Strekalov, N°18
Orlan-DMA Folding of the second Kristall solar cell
28 May 1995 0h 21m
  • Vladimir Dezhurov, N°27
  • Gennadii Strekalov, N°18
Orlan-DMA New setting of the docking adapter
1 Jun 1995 0h 24m
  • Vladimir Dezhurov, N°27
  • Gennadii Strekalov, N°18
Orlan-DMA New setting of the docking adapter
14 Jul 1995 5h 34m
  • Anatolii Solovyov, N°27
  • Nikolai Budarin, N°18
Orlan-DMA Unfolding solar cell on Spektr module
19 Jul 1995 3h 8m
  • Anatolii Solovyov, N°27
  • Nikolai Budarin, N°18
Orlan-DMA Mounting and recovery of experiments
21 Jul 1995 5h 35m
  • Anatolii Solovyov, N°27
  • Nikolai Budarin, N°18
Orlan-DMA Mounting and recovery of experiments
20 Oct 1995 5h 16m
  • Sergei Avdeev, N°18
  • Thomas Reiter, N°26
Orlan-DMA Mounting and recovery of experiments
8 Dec 1995 0h 29m
  • Yurii Gidzenko, N°25
  • Sergei Avdeev, N°18
Orlan-DMA New setting of the docking adapter
8 Feb 1996 3h 5m
  • Yurii Gidzenko, N°25
  • Thomas Reiter, N°26
Orlan-DMA Recovery of experiments, expensing of SPK Ikar
15 Mar 1996 5h 52m
  • Yurii Onufriyenko, N°25
  • Yurii Usachyov, N°26
Orlan-DMA Mounting the second Strela crane on Mir
20-21 May 1996 5h 20m
  • Yurii Onufriyenko, N°25
  • Yurii Usachyov, N°26
Orlan-DMA New setting of a solar cell from DM to Q1
24-25 May 1996 5h 43m
  • Yurii Onufriyenko, N°25
  • Yurii Usachyov, N°26
Orlan-DMA Installation solar cell on the Kvant-1 module
30 May 1996 4h 20m
  • Yurii Onufriyenko, N°25
  • Yurii Usachyov, N°26
Orlan-DMA Mounting tools on the Priroda module
6 Jun 1996 3h 34m
  • Yurii Onufriyenko, N°25
  • Yurii Usachyov, N°26
Orlan-DMA Mounting and exchanging tools on the Spektr module
13 Jun 1996 5h 42m
  • Yurii Onufriyenko, N°25
  • Yurii Usachyov, N°26
Orlan-DMA Mounting power bus structure on the Kvant-1 module
2 Dec 1996 5h 58m
  • Valerii Korzun, N°27
  • Aleksandr Kaleri, N°26
Orlan-DMA New setting of the Rapana structure on Kvant-1 module
9 Dec 1996 6h 38m
  • Valerii Korzun, N°27
  • Aleksandr Kaleri, N°26
Orlan-DMA Installation of the  Kurs antenna on the DM
29 Apr 1997 4h 57m
  • Vasilii Tsibliyev, N°1060005
  • Jerry Linenger, N°1060004
Orlan-M
  • First U.S. astronaut Orlan spacewalk
  • Mounting and recovery of experiments
22 Aug 1997 3h 16m
  • Anatolii Solovyov, N°27
  • Pavel Vinogradov, N°26
Orlan-DMA
  • IVA
  • Inspection of Spektr, repairing of cables
6 Sep 1997 6h 0m
  • Anatolii Solovyov, N°27
  • Michael Foale, N°26
Orlan-M Inspection of Spektr, searching for a leak (failed)
20 Oct 1997 6h 38m
  • Anatolii Solovyov, N°27
  • Pavel Vinogradov, N°26
Orlan-DMA
  • IVA
  • Replacement of Spektr/Mir hatch
3 Nov 1997 6h 4m
  • Anatolii Solovyov, N°1060005
  • Pavel Vinogradov, N°1060004
Orlan-M Demounting Kristall solar cell on Kvant-1 module
6 Nov 1997 6h 17m
  • Anatolii Solovyov, N°1060005
  • Pavel Vinogradov, N°1060004
Orlan-M Installation new solar cell on Kvant-1 module
8-9 Jan 1998 4h 4m
  • Anatolii Solovyov, N°1060005
  • Pavel Vinogradov, N°1060004
Orlan-M Recovery of experiments, inspection of hatch Q-2
14-15 Jan 1998 6h 38m
  • Anatolii Solovyov, N°1060005
  • David Wolf, N°1060004
Orlan-M Testing tools, inspection of complete Mir station
3 Mar 1998 ~ 1h 50m
  • Talgat Musabayev, N°1060005
  • Nikolai Budarin, N°1060006
Orlan-M Airlock hatch failed to open; VKD aborted
1 Apr 1998 6 h 26m
  • Talgat Musabayev, N°1060005
  • Nikolai Budarin, N°1060006
Orlan-M Repairing Spektr solar cell structure
6 Apr 1998 4h 23m
  • Talgat Musabayev, N°1060005
  • Nikolai Budarin, N°1060006
Orlan-M Continuing repairing the Spektr module
11 Apr 1998 6h 25m
  • Talgat Musabayev, N°1060005
  • Nikolai Budarin, N°1060006
Orlan-M Demounting VDU from the Sofora structure
17 Apr 1998 6h 33m
  • Talgat Musabayev, N°1060004
  • Nikolai Budarin, N°1060006
Orlan-M Preparing VDU-mounting
22 Apr 1998 6h 21m
  • Talgat Musabayev, N°1060004
  • Nikolai Budarin, N°1060006
Orlan-M Mounting VDU on the Sofora structure
15 Sep 1998 0h 30m
  • Gennadii Padalka, N°1060004
  • Sergei Avdeev, N°1060006
Orlan-M
  • IVA
  • Repairing cables in the Spektr module
10-11 Nov 1998 5h 54m
  • Gennadii Padalka, N°1060004
  • Sergei Avdeev, N°1060005
Orlan-M Mounting tools, deploying Sputnik-41
16 Apr 1999 6h 19m
  • Viktor Afanasev, N°1060004
  • Jean-Pierre Haigneré, N°1060005
Orlan-M Deploying Sputnik-99, evaluation of tools
23 Jul 1999 6h 7m
  • Viktor Afanasev, N°1060006
  • Sergei Avdeev, N°1060004
Orlan-M Mounting parabola antenna on Sofora
28 Jul 1999 5h 22m
  • Viktor Afanasev, N°1060006
  • Sergei Avdeev, N°1060004
Orlan-M Unfolding parabola antenna on Sofora
12 May 2000 4h 52m
  • Sergei Zalyotin, N°1060004
  • Aleksandr Kaleri, N°1060006
Orlan-M
  • Last Mir spacewalk.
  • Testing special adhesive, general inspection

Notes


Ref.: #210 - update: 13.07.07 Home