WilliamsSunita Pandya (Lyn) |
USA |
International order n°: 454 |
US astr. n°: 287 |
|
|
| N° | Launch spacecraft |
Date and time
launch (UT) |
Status while launch |
Landing Spacecraft |
Date and time
landing (UT) |
Duration |
| 1 | STS-116 (Discovery/33) |
10 Dec 2006 01h 47m 35s |
MS - FE/PE-14,PE-15/ISS | STS-117 (Atlantis/28) |
22 Jun 2007 19h 50m 48s |
194d 18h 03m 13s |
| 2 | Soyuz TMA-05M | 15 July 2012 02h 40m |
FE ISS-32 exp Cmd ISS-33 exp |
Soyuz TMA-05M | 19 Nov 2012 01h 53m |
126d 23h 13m |
| Total duration: | 321d 17h 16m 13s | |||||
| Date | Time of starting |
Duration | Crew & Remarks |
| 16 Dec 2006 | 19:25 | 7h 31m | Curbeam and Williams; mission "STS-116". The 28th EVA from airlock Quest. |
| 31 Jan 31 2007 | 15:14 | 7h 55m | Lopez-Alegria and Williams; expedition ISS-14. The 30th EVA from airlock Quest. |
| 04 Feb 2007 | 13:38 | 7h 11m | Lopez-Alegria and Williams; expedition ISS-14. The 31st EVA from airlock Quest. |
| 08 Feb 2007 | 13:26 | 6h 40m | Lopez-Alegria and Williams; expedition ISS-14. The 32nd EVA from airlock Quest. |
| 30 Aug 2012 | UT | 8h 17m | Hoshide and S. Williams; mission ISS-Exp.32 The astronauts replaced a faulty power routing unit (partly failed) on the station′s truss and run cables for an upcoming Russian laboratory module. |
| 05 Sep 2012 | UT | 6h 28m | Hoshide and S. Williams; mission ISS-Exp.32 The astronauts completed the installation of a spare power unit on the station′s truss. |
| 01 Nov 2012 | UT | 6h 38m | Hoshide and S. Williams; mission ISS-Exp.32 The astronauts repaired an ammonia leak on one of the station′s port-side radiators. |
| Total: | 50h 40m | EVAs: 7 | |
| No. | Mission | Job | Date |
| 1 | Soyuz TMA-03M | Flight Engineer | 21 Dec 2011 |