SatcherRobert Lee |
USA |
International order n°: 509 |
US astr. n°: 329 |
|
|
| No | Launch spacecraft | Launch date and time (UT) |
Status while launch |
Landing spacecraft | Landing date and time (UT) |
Duration |
| 1 | STS-129 (Atlantis/31) |
16 Nov 2009 19h 28m |
Pilot | STS-129 (Atlantis/31) |
27 Nov 2009 14h 44m |
10d 19h 16m |
| Total duration: | 10d 19h 16m | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 19 Nov 2009 | - UT | 6h 37m | Satcher and M.Foreman; mission STS-129 Installing a spare antenna on the station′s truss, or backbone, and a bracket for ammonia lines on the Unity module. They lubricated the grapple mechanism on the Payload Orbital Replacement Unit Attachment Device on the Mobile Base System and lubricated the snares of the hand of the station′s Japanese robotic arm. |
| 23 Nov 2009 | - UT | 5h 42m | Satcher and R.Bresnik; mission STS-129 Installing a new oxygen tank on the Quest airlock and the next set of the "Materials on International Space Station Experiment" known as MISSE-7A and 7B, on ELC-2. They worked the heater cables on a docking adapter in advance of the Tranquility node's installation on Unity′s port side and deployed another cargo platform on the truss. |
| Total: | 12h 19m | EVAs: 2 | |