Parazynski

Scott Edward

USA


International order n°: 321

US astr. n°: 204


Personal data:

Birthdate:  28 Jul 1961
Birthplace:  Little Rock / Arkansas
Marital status:  married
Children:  two
Grade / Fonction:  MD, NASA
Selection date:  31 Mar 1992
Selection group:  NASA-14
Job:  MSP
Status:  Ret. 13 Mar 2009

Spaceflights:

Startup
spacecraft
Date and time
launch (UT)
Status while
launch
Spacecraft
of landing
Date and time
landing (UT)
Duration
1 STS-66
(Atlantis/13)
16h.59m.43s.
Nov 03, 1994
MS STS-66
(Atlantis/13)
15h.34m.35s.
Nov 14, 1994
10d.22h.34m.52s.
2 STS-86
(Atlantis/20)
02h.34m.19s.
Sep 26, 1997
MS/FE
VE-21/MIR
STS-86
(Atlantis/20)
21h.56m.31s.
Oct 06, 1997
10d.19h.22m.12s.
3 STS-95
(Discovery/25)
19h.19m.34s.
Oct 29, 1998
MS 2 STS-95
(Discovery/25)
17h.04m.29s.
Nov 07, 1998
8d.21h.44m.55s.
4 STS-100
(Endeavour/16)
18h.40m.42s.
Apr 19, 2001
MS STS-100
(Endeavour/16)
16h.11m.56s.
May 01, 2001
11d.21h.31m.14s.
5 STS-120
(Discovery/34)
15h.38m.19s.
Oct 23, 2007
MS STS-120
(Discovery/34)
18h.02m.13s.
Nov 07, 2007
15d.02h.23m.54s.
Total duration: 57d 15h 37m 07s


EVA′s:

Date of
beginning
Time (UT)of
beginning
Duration Explanation
01 Oct 1997 17:29 5h 01m Parazynski and V.Titov; mission "STS-86" - Recovery of experiments from DM (EDFT-06)
22 Apr 2001 11:45 7h 10m C.Hadfield and Parazynski; mission "STS-100" - Installing the Canadian built robotic arm (57.7 foot long) called: Canadarm2
24 Apr 2001 12:34 7h 40m C.Hadfield and Parazynski; mission "STS-100" - Connecting the Power and Data Grapple Fixture circuits for the robotic arm
26 Oct 2007 10:02 6h 14m Parazynski and D.Wheelock; mission "STS-120". The 42nd EVA from airlock Quest.
Retrieve and stow S-band Antenna Support Assembly, detach Node 2 ("Harmony") heater cables and remove cover from Node 2 aft berthing mechanism, stow grapple fixture on Node 2, disconnect Z1/P6 truss fluid lines, install shrouds on P6 radiator and Sequential Shunt Unit, move and attach Node 2 to Node 1 left-hand docking port with Station robotic arm, pressurise area between Node 1 and Node 2 hatches, perform leak check, open Node 1 hatch
28 Oct 2007 09:32 6h 33m Parazynski and D.Tani; mission "STS-120". The 43rd EVA from airlock Quest.
Disconnect Z1 to P6 truss cables and unbolt P6; outfit outside Node 2 with handrails, worksite interface fixtures, gap spanners and install thermal covers, remote Node 2 berthing mechanism restraints; install grapple fixture on Node 2; configure squib firing unit on S1 truss for deploying radiators.
30 Oct 2007 09:45 7h 08m Parazynski and D.Wheelock; mission "STS-120". The 44th EVA from airlock Quest.
The astronauts bolt P6 truss to P5 truss, attached P5 to P6 cabling, removed P6 radiator restraint and cover on Sequential Shunt unit and deploy radiator, configured squib firing unit on P1 truss, relocated main Bus Switching Unit from the Shuttle Cargo Bay to External Stowage Platform 2.
03 Nov 2007 10:03 7h 19m Parazynski and D.Wheelock; mission "STS-120". The 45th EVA from airlock Quest.
Attaching cufflink-like clips across the 15-foot width of the torn P6-4B solar array blanket to provide the strength needed to permit its full extension. This dramatic repair job was carried out successful.
Total: 47h 05m EVAs: 7

Additional information


Ref: #16, #21 - update: 09.05.18