MarshburnThomas Henry |
USA |
International order No: 501 |
US astr. No: 323 |
|
Ord. num. |
Startup spacecraft |
Date and time launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time
landing (UT) |
Duration |
1 | STS-127 (Endeavour/23) |
15 Jul 2009 22h.03m. |
MSP | STS-127 (Endeavour/23) |
31 Jul 2009 14h 48m |
15d 16h 45m |
2 | Soyuz TMA-07M | 19 Dec 2012 12h 12m |
FE ISS Exp.34/35 |
Soyuz TMA-07M | 14 May 2013 02h 31m |
145d 14h 19m |
3 | Dragon Crew-3 | 11 Nov 2021 02:03:30 UTC |
PLT ISS-66/67 | Dragon Crew-3 | in flight UTC |
|
Total duration: | 161d 07h 04m |
Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
20 July 2009 | - UT | 6h 53m | Marshburn and D.Wolf; mission STS-127 Transport of spare parts from a cargo carrier to a stowage platform on the station's truss. These parts include: an antenna, a pump module and a rail mechanism that allows a transporter to move up and down the truss. They also relocated a grapple bar onto an ammonia tank assembly as a get-ahead for the STS-129 mission, targeted for November 2009. A planned installation of a camera on the Japanese Experiment Facility was postponed to a future EVA for want of time. |
24 July 2009 | - UT | 7h 12m | Marshburn and C.Cassidy; mission STS-127 Replacing the final four batteries on the port truss. |
27 July 2009 | - UT | 4h 54m | Marshburn and C.Cassidy; mission STS-127 Removing covers from the Dextre robotic arm, reconfigure cables on a panel for some circuit breakers and deploy two additional payload attachment systems. They also installed a second camera that will provide video of experiments on the aft end of the exposed facility, a work, which was originally scheduled for EVA 4. Finally, they replaced an aging camera system on the starboard truss. Instead some get ahead tasks were completed which included installation of handrails and a portable foot restraint. |
11 May 2013 | UT | 5h 30m | Marshburn and C.Cassidy; mission ISS-Exp.34/35 Inspection and replacement of a pump controller box on the station&primes far port truss (P6) suspected of leaking ammonia coolant. |
02 Dec 2021 | UT | 6h 32m | Marshburn and K.Barron; mission ISS-Exp.66/67 They replaced a faulty Communications Antenna on International Space Station. . |
Total: | 31h 01m | EVAs: 5 |
No. | Mission | Job | Date |
1 | Soyuz TMA-05M | Flight Engineer | 15 July 2012 |
2 | Soyuz MS-13 | Commander | 20 July 2019 |
3 | Soyuz MS-15 | FE | 25 Sep 2019 |