Marshburn

Thomas Henry

USA


International order No: 501

US astr. No: 323


Personal data:

Birth date:  29 Aug 1960
Birthplace:  Statesville / North Carolina
Marital status:  married
Children:  one
Selection date:  06 May 2004
Selection group:  NASA-19
Job:  MSP
Status:  active

Spaceflights:

Ord.
num.
Startup
spacecraft
Date and time
launch (UT)
Status while
launch
Spacecraft
of landing
Date and time
landing (UT)
Duration
1 STS-127
(Endeavour/23)
15 Jul 2009
22h.03m.
MSP STS-127
(Endeavour/23)
31 Jul 2009
14h 48m
15d 16h 45m
2 Soyuz TMA-07M 19 Dec 2012
12h 12m
FE
ISS Exp.34/35
Soyuz TMA-07M 14 May 2013
02h 31m
145d 14h 19m
3 Dragon Crew-3 11 Nov 2021
02:03:30 UTC
PLT ISS-66/67 Dragon Crew-3 in flight
UTC
Total duration: 161d 07h 04m

EVA′s

Date of
beginning
Time of
beginning
Duration Crew & Remarks
20 July 2009 - UT 6h 53m Marshburn and D.Wolf; mission STS-127
Transport of spare parts from a cargo carrier to a stowage platform on the station's truss. These parts include: an antenna, a pump module and a rail mechanism that allows a transporter to move up and down the truss. They also relocated a grapple bar onto an ammonia tank assembly as a get-ahead for the STS-129 mission, targeted for November 2009. A planned installation of a camera on the Japanese Experiment Facility was postponed to a future EVA for want of time.
24 July 2009 - UT 7h 12m Marshburn and C.Cassidy; mission STS-127
Replacing the final four batteries on the port truss.
27 July 2009 - UT 4h 54m Marshburn and C.Cassidy; mission STS-127
Removing covers from the Dextre robotic arm, reconfigure cables on a panel for some circuit breakers and deploy two additional payload attachment systems. They also installed a second camera that will provide video of experiments on the aft end of the exposed facility, a work, which was originally scheduled for EVA 4. Finally, they replaced an aging camera system on the starboard truss. Instead some get ahead tasks were completed which included installation of handrails and a portable foot restraint.
11 May 2013 UT 5h 30m Marshburn and C.Cassidy; mission ISS-Exp.34/35
Inspection and replacement of a pump controller box on the station&primes far port truss (P6) suspected of leaking ammonia coolant.
02 Dec 2021 UT 6h 32m Marshburn and K.Barron; mission ISS-Exp.66/67
They replaced a faulty Communications Antenna on International Space Station. .
Total: 31h 01m EVAs: 5

Backup assignments:

No. Mission Job Date
1  Soyuz TMA-05M  Flight Engineer  15 July 2012
2  Soyuz MS-13  Commander  20 July 2019
3  Soyuz MS-15  FE  25 Sep 2019

Additional information:


Ref: #14, #16 - update: 13.04.22