ChiaoLeroy |
USA |
International order nº: 318 |
US astr. nº: 203 |
|
|
| Ord. num. |
Startup spacecraft |
Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | STS-65 (Columbia/17) |
16h.43m.00s. Jul 08, 1994 |
MS | STS-65 (Columbia/17) |
10h.39m.08s. Jul 23, 1994 |
14d.17h.56m.08s. |
| 2 | STS-72 (Endeavour/10) |
09h.41m.00s. Jan 11, 1996 |
MS | STS-72 (Endeavour/10) |
07h.42m.46s. Jan 20, 1996 |
8d.22h.01m.46s. |
| 3 | STS-92 (Discovery/28) |
23h.17m.00s. Oct 11, 2000 |
MS | STS-92 (Discovery/28) |
21h.00m.47s. Oct 24, 2000 |
12d.21h.43m.47s. |
| 4 | Soyuz-TMA5 | 03h.06m.28s. Oct 14, 2004 |
FE1 Cdr/PE-10/ISS |
Soyuz-TMA5 | 22h.08m.27s. Apr 24, 2005 |
192d.19h.01m.59s. |
| Total duration: | 229d 08h 43m 40s. | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 15 Jan 1996 | 05:35 UT | 6h 09m 19s | Chiao and D.Barry; mission "STS-72" Evaluation of EVA activity tools (EDFT-03) |
| 17 Jan 1996 | 05:40 UT | 6h 53m 41s | Chiao and W.Scott; mission "STS-72" Evaluation of EVA activity tools (EDFT-03) |
| 15 Oct 2000 | 14:27 UT | 6h 28m | Chiao and W. McArthur; mission "STS-92" The S-band Antenna Support Assembly was relocated on the Z1 Truss. The Z1 starboard bulkhead thermal shrouds were removed and stowed. The port Extravehicular Tool Storage Devices were released and transferred from the Spacelab Logistics Pallet to the Z1 Truss. The Z1-to-Node 1 umbilicals, or cables, were connected. The Space-to-Ground Antenna dish was installed onto the boom and the boom was deployed |
| 17 Oct 2000 | 14:30 UT | 6h 48m | Chiao and W.McArthur; mission "STS-92" Two DC-to-DC Converter Unit-Heat Pipes were installed on Z1. The Z1 keel pin assembly was then relocated to another location on Z1. The Z1/P6 launch locks were removed, then the Assembly Power Converter Units jumpers were also removed from the Pressurized Mating Adapter 2 to allow for installation of four Z1 cables. The starboard Extravehicular Tool Storage Device was released and transferred from the Spacelab Logistics Pallet to the Z1 Truss. |
| 26 Jan 2005 | 07:41 UT | 5h 30m | Chiao and S.Sharipov; expedition ISS-10. The 14th EVA from airlock Pirs. Installing a work platform on the hull of the command module, to mount the European commercial experiment Rokviss, to relocate the Japanese space exposure experiment package and to install a Russian biological experiment |
| 28 Mar 2005 | 06:25 | 4h 30m | Chiao and S.Sharipov; expedition ISS-10. The 15th EVA from airlock Pirs. Installing three communications antennas for the ATV (Automated Transfer Vehicle) and a GPS (Global Positioning System) antenna; Sharipov manually deployed a Russian experiment, tossing a small science satellite called "Nanosatellite" into orbit |
| Total: | 36h.19m. | EVAs: 6 | |
| No. | Mission | Job | Date |
| 1 | Soyuz TMA-4 | Flight Engineer |
| Ref.: #16, #21 - update: 01.07.19 | Home |