FuglesangArne Christer |
Sweden |
International order n°: 452 |
Sweden astr. n°: 1 |
|
|
| No | Launch spacecraft |
Launch date and time (UT) |
Status while launch |
Landing Spacecraft |
Landing date and time (UT) |
Duration |
| 1 | STS-116 (Discovery/33) |
10 Dec 2006 01h 47m 35s |
MS | STS-116 (Discovery/33) |
22 Dec 2006 22h 32m 52s |
12d 20h 45m 17s |
| 2 | STS-128 (Discovery/37) |
29 Aug 2009 03h 59m |
MSP | STS-128 (Discovery/37) |
12 Sep 2009 00h 53m |
13d 20h 54m |
| Total duration: | 26d 17h 39m 17s | |||||
| Date of beginning |
Time of beginning |
Duration | Explanation |
| 12 Dec 2006 | 20:31 UT | 6h 36m | Fuglesang and R.Curbeam; mission STS-116. The 26th EVA from airlock Quest. Align and connect the P5 truss segment to P4 |
| 14 Dec 2006 | 19:41 UT | 5h 00m | Fuglesang and R.Curbeam; mission STS-116. The 27th EVA from airlock Quest. Reconfigure power on channels 2 and 3 of the station's electrical system |
| 18 Dec 2006 | 19:00 UT | 6h 38m | Fuglesang and R.Curbeam; mission STS-116. The 29th EVA from airlock Quest. Fully retract the array |
| 03 Sep 2009 | - UT | 6h 39m | Fuglesang and D.Olivas; mission STS-128. Removing the new ammonia tank from the shuttle's payload bay and replacing it with the used tank on the station. The new tank, weighing about 1,800 pounds, was the most mass ever moved around by spacewalking astronauts. After the new tank was installed, the old one was stowed in the shuttle for its return to Earth. |
| 05 Sep 2009 | - UT | 7h 01m | Fuglesang and D.Olivas; mission STS-128. Preparing for the arrival of the Tranquility node by attaching cables between the starboard truss and the Unity node, the area where Tranquility will be installed. Tranquility is targeted to arrive to the station on STS-130 in February 2010. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas and a new circuit breaker. |
| Total: | 31h 54m | EVAs: 5 | |
| No. | Mission | Job | Date |
| 1 | Soyuz TM-22 | Flight Engineer |
![]() |