YurchikhinFyodor Nikolayevich |
USSR/CIS |
International order nº: 426 |
Russian cosm. nº: 96 |
| Ord. num. |
Startup spacecraft |
Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
| 1 | STS-112 (Atlantis/26) |
07 Oct 2002 19:45:51 |
MSP | STS-112 (Atlantis/26) |
18 Oct 2002 15:44:35 |
10d.19h.58m.44s. |
| 2 | Soyuz-TMA10 | 07 Apr 2007 17:31:14 |
FE Cdr/FE ISS-15 |
Soyuz-TMA10 | 21 Oct 2007 10:35:49 |
196d 17h 04m 35s |
| 3 | Soyuz-TMA19 | 15 Jun 2010 21:35 |
CDR CDR ISS-24/25 |
Soyuz-TMA19 | 26 Nov 2010 04:46 |
163d 07h 11m |
| 4 | Soyuz TMA-09M | 28 May 2013 20:31 |
Cdr ISS-36/37 |
Soyuz TMA-09M | 11 Nov 2013 02:49 |
166d 06h 19m |
| 5 | Soyuz MS-04 | 20 Apr 2017 07:13:43 |
FE3 ISS-51/52 |
Soyuz MS-04 | 03 Sep 2017 01:21:43 |
135d 18h 08m |
| Total duration: | 672d 20h 41m | |||||
| Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
| 30 May 2007 | 19:05 UT | 5h 25m | Yurchikhin and Kotov; expedition ISS-15. The 21st EVA from airlock Pirs. Installing orbital debris protection panels on the Zvezda Service Module and replacing experiments on the hull of Zvezda |
| 06 Jun 2007 | 14:23 UT | 5h 37m | Yurchikhin and Kotov; expedition ISS-15. The 22nd EVA from airlock Pirs. Installing a section of Ethernet cable on the Zarya module, installing additional Service Module Debris Protection (SMDP) panels on Zvezda, and deploying a Russian scientific experiment |
| 23 Jul 2007 | 10:24 UT | 7h 41m | Yurchikhin and C.Anderson; expedition ISS-15. The 37th EVA from airlock Quest. Replacing a failed power controller on the station's truss, jettison a refrigerator-sized ammonia reservoir tank and clean seals on a docking port on the Unity module |
| 27 Jul 2010 | UT | 6h 42m | Yurchikhin and M. Korniyenko; mission ISS Preparing the recently delivered Russian Rassvet Module for future automated dockings by Russian spacecraft |
| 15 Nov 2010 | UT | 6h 27m | Yurchikhin and O. Skripochka; mission ISS Installing a multipurpose workstation on the starboard side of the Zvezda service module’s large-diameter section, cleaning thermal insulation around the vents for the Elektron oxygen generation system and relocating a television camera from one end of the Rassvet docking compartment to the other (failed due to interference with insulation where it was to be installed). |
| 24 Jun 2013 | UT | 6h 34m | Yurchikhin and A. Misurkin; mission ISS They replaced a fluid flow regulator on the Russian segment’s Zarya module. They also removed the Photon-Gamma unit of the Molina-Gamma experiment, which measures gamma splashes and optical radiation during terrestrial lightning and thunder conditions, from a portable workstation on Zvezda |
| 16 Aug 2013 | UT | 7h 29m | Yurchikhin and A. Misurkin; mission ISS They continued routing power and Ethernet cables for the future arrival of the Russian Multipurpose Laboratory Module, which will be launched aboard a Proton rocket from the Baikonur Cosmodrome in Kazakhstan. They also installed on the Poisk module a panel of experiments designed to collect data on the effects of the microgravity environment in low-Earth orbit. |
| 22 Aug 2013 | UT | 5h 58m | Yurchikhin and A. Misurkin; mission ISS The cosmonauts removed a space laser communications system from the hull of the Zvezda service module and planned to install a pointing platform on which a small optical telescope will be installed on a future Russian spacewalk. This task failed. |
| Total: | 51h 53m | EVAs: 8 | |
| No. | Mission | Description | Date |
| 1 | Soyuz TMA-8 | Cmd | |
| 2 | Soyuz TMA-07M | Cmd | 19 Dec 2012 |
| 3 | Soyuz MS-03 | Cmd | 17 Nov 2016 |
![]() |
![]() |
| Ref.: #7(JR737), #16, #21, #302, #404 - update: 19.04.19 | Home |