ISS: Expedition 3

Aug 13, 2001 - Dec 15, 2001

International



Launch, orbit & landing data:

Launch date - time 10 Aug 2001 - 21:10 UT
Launch spacecraft  STS-105
Flight Crew Culbertson, Frank (CDR)
Dezhurov, Vladimir (FE)
Tyurin, Mikhail (FE)
Backup crew 
Landing date - time 17 Dec 2001 - 17:55 UT
Landing spacecraft STS-108
Flight Duration (d:hr:min) 128:20:45
Nbr orbits 2028

Crew

No. Surname Given name Job Mission Duration
1  Culbertson  Frank Lee, Jr.  ISS-Commander 128d 20h 45m 
2  Dezhurov  Vladimir Nikolayevich  Flight Engineer 128d 20h 45m 
3  Tyurin  Mikhail Vladislavovich  Flight Engineer 128d 20h 45m 

Summary:

Launch from Cape Canaveral; landing on Cape Canaveral; docking on the ISS; crew replaced the Expedition 2 crew; EVA by Dezhurov and Tyurin on 08.10.2001 (4h 58m) using first time the new Russian built airlock and docking port named Pirs, which docked on the Zvezda-module since September 2001; second spacewalk by Dezhurov and Tyurin on 15.10.2001 (5h 52m) to mount a variety of instruments outside the Zvezda service module; third EVA by Dezhurov and Culbertson on 12.11.2001 (5h 4m) to connect seven cables between Zvezda service module and Pirs docking module and take photos; forth EVA by Dezhurov and Tyurin on 03.12.2001 (2h 46m) to cut away a rubbery O-ring seal that was preventing an unmanned cargo freighter from properly docking to the complex; the crew carried home the results of following experiments: Advanced Protein Crystallization Facility, the Dynamically Controlled Protein Crystal Growth experiment and cells from the Cellular Biotechnology Operations Support System (CBOSS).

Mission report:

External links:


Ref: #7(JR459,464-465,467), #16 - update: 05.01.12