Manned Flight nº: 100 |
Earth orbit Flight nº: 97 |
USA manned Flight nº: 43 |
Launch, orbit & landing data:
Designation | 15234 / 84093A |
Launch date - time | 30 Aug 1984 - 12:41:50 UT |
Launch site | KSC, LC39A |
Launch vehicle |
Space Shuttle |
Orbiter | Discovery OV-103 (#1) |
Primary payload | SBS 4/Telstar 3C/SYNCOM IV-2 |
Mass (kg) | |
Call Sign | |
Earth orbit on : |
- Perigee x Apogee | 300 x 307 km |
- Inclination | 28.5° |
- Period | 90.6 min |
Landing date - time | 05 Sep 1984 - 13:37:54 UT |
Landing location | Edwards AFB, Runway 23 |
Flight Duration (d:hr:min) | 6d 00h 56m |
Nbr orbits | 97 |
|
|
1e flight "Discovery" Space Shuttle, manned six crew.
Flight Crew
Nr. |
Surname |
Given name |
Job |
Duration |
1 |
Hartsfield |
Henry Warren, Jr. "Hank" |
CDR |
6d 00h 56m |
2 |
Coats |
Michael Lloyd |
PLT |
6d 00h 56m |
3 |
Resnik |
Judith Arlene |
MSP |
6d 00h 56m |
4 |
Hawley |
Steven Alan |
MSP |
6d 00h 56m |
5 |
Mullane |
Richard Michael |
MSP |
6d 00h 56m |
6 |
Walker |
Charles David |
PSP |
6d 00h 56m |
Mission details:
Launch from Cape Canaveral (KSC); landing on Edwards
AFB; first mission of orbiter "Discovery"; deploying of communications
satellites SBS-D (USA), Telstar 3-C (USA) and Syncom IV-2/Leasat 2 (US
Navy); solar wing (31 m) was extended from payload bay; Walker worked on
the Continuous Flow Electrophoresis System .
LV Configuration: STS-16 (41-D). Payload: Discovery F01 / SBS 4[PAM-D] / Telstar 302[PAM-D]. Mass: 21,552 kg.
|
STS-41-D - View of launch of orbiter Discovery on 41-D mission - Credit: NASA. |
deployed SBS 4, Leasat 1, Telstar 3C. Payloads: Satellite Business System (SBS)-D commu-nications satellite with Payload Assist Module (PAM)-D deployment, Syncom IV-2 communica-tions satellite with its unique stage deployment, Telstar (American Telephone and Telegraph) 3-C with PAM-D deployment, Office of Aeronautics and Space Technology (OAST)-1 experiments. Deployment and restowing of large solar array. Continuous Flow Electrophoresis (CFES). IMAX camera.
|
STS-41-D - View of foot restraint strayed from Discovery - Credit: NASA. |
Orbits of Earth: 96. Distance traveled: 4,007,266 km. Orbiter Liftoff Mass: 119,511 kg. Orbiter Mass at Landing: 91,476 kg. Payload to Orbit: 21,552 kg. Payload Returned: 5,123 kg. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 370 kph. Touchdown miss distance: 765 m. Landing Rollout: 3,131 m. A student experiment, sponsored by Rockwell International, of indium crystal growth using the float zone technique was successful, although a blown fuse resulted in a premature shutdown.
| STS-41-D - Payload specialist Charles Walker works with CFES experiment - Credit: NASA. |
NASA Official Mission NarrativeMission Name: 41-D (12)
DISCOVERY (1)
Pad 39-A (24)
12th Shuttle Mission
1st Flight OV-103
RSLS Abort after SSME Ignition (1)
2nd Rollback
Crew:
Henry W. Hartsfield (2), Jr., Commander
Michael L. Coats (1), Pilot
Judith A. Resnik (1), Mission Specialist 1
Steven A. Hawley (1), Mission Specialist 2
Richard M. Mullane (1), Mission Specialist 3
Charles D. Walker (1), Payload Specialist 1
| STS-41-D - Mission specialist Judith Resnik at interdeck access hatch - Credit: NASA. 32,433 bytes. 460 x 460 pixels. |
Milestones:
OPF-Nov. 10,1983
VAB-Dec. 9,1983
(storage)
Flow A:
OPF - Jan. 10, 1984
VAB - May 12,1984
PAD - May 19,1984
Flow B (rollback):
VAB - July 14, 1984
OPF - July 17,1984
VAB - Aug. 1,1984
PAD - Aug. 9, 1984
| STS-41-D - Deployment of the SBS-4 communications satellite - Credit: NASA. 42,820 bytes. 520 x 520 pixels. |
Payload:
SBS-D,TELSTAR-3C,LEASAT-1,OAST-1,CFES(5),RME(3),SSIP(x1),CLOUDS,
IMAX-CAMERA(2)
Mission Objectives: Launch:
August 30, 1984, 8:41:50 a.m, EDT. Launch attempt June 25 scrubbed during T-9 minute hold due to failure of orbiter's back-up general purpose computer (GPC). Launch attempt June 26 aborted at T-4 seconds when GPC detected anomaly in orbiter's number three main engine. Discovery returned to OPF and number three main engine replaced. (To preserve launch schedule of future missions, 41-D cargo remanifested to include payload elements from both 41-D and 41-F flights; 41-F mission cancelled.) Shuttle restacked and returned to pad. Third launch attempt Aug. 29 delayed when discrepancy noted in flight software of Discovery's master events controller relating to solid rocket booster fire commands. A software patch was verified and implemented to assure all three booster fire commands were issued in the proper time interval. Launch Aug. 30 delayed six minutes, 50 seconds when private aircraft intruded into warning area off coast of Cape Canaveral. Launch Weight: 263,477 lbs.
Orbit:
Altitude: 184nm
Inclination: 28.5 degrees
Orbits: 97
Duration: Six days, zero hours, 56 minutes, four seconds.
Distance: 2,490,000 miles
| STS-41-D - View of the SBS-4 communications satellite in orbit above the earth - Credit: NASA. 32,187 bytes. 518 x 518 pixels. |
Hardware:
SRB: BI-011
SRM: 013LW(HPM)
ET : 13/LWT-6
MLP : 2
SSME-1: SN-2109
SSME-2: SN-2018
SSME-3: SN-2021 Landing:
September 5, 1984, 8:37:54 s.m. PDT, Runway 17, Edwards Air Force Base, Calif. Rollout distance: 10,275 feet. Rollout time:60 seconds. Landing planned for Edwards desert runway because it was Discovery's first flight. Orbiter returned to KSC Sept. 10, 1984. Landing Weight: 201,674 lbs.
| STS-41-D - Deployment of the Syncom IV (Leasat-2) satellite - Credit: NASA. 35,159 bytes. 515 x 515 pixels. |
Mission Highlights:
Three satellites deployed: Satellite Business System SBS-D, SYNCOM IV-2 (also known as LEASAT2) and TELSTAR. The 102- foot-tall, 13-loot-wide Office of Application and Space Technology (OAST-1) solar wing extended from payload bay. Wing carried different types of solar cells and extended to full height several times. It demonstrated large lightweight solar arrays for future in building large facilities in space such as Space Station. Other payloads: Continuous Flow Electrophoresis System (CFES) Ill; Radiation Monitoring Equipment (RME); Shuttle Student Involvement Program (SSIP) experiment; lMAX camera, being flown second time; and an Air Force experiment, Cloud Logic to Optimize Use of Defense Systems (CLOUDS).
|
STS-41-D - View of the Syncom IV satellite in orbit over the earth - Credit: NASA. |
|
STS-41-D - Deployment of the Telstar communications satellite - Credit: NASA. |
|
STS-41-D - View of Mission Specialist Judith Resnik on the middeck - Credit: NASA. |
|
STS-41-D - Crew of STS 41-D makes a visual post-flight inspection of orbiter - Credit: NASA. |
Astrophilately covers:
Landing cancel Edwards AFB. |
Ref.: #1, #6, #7, #8, #16 - update: 08.03.19
|
Home |