WheelockDouglas Harry |
USA |
International order n°: 466 |
US astr. n°: 297 |
Personal data:
|
Ord. num. |
Startup spacecraft |
Date and time of launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time of landing (UT) |
Duration |
1 | STS-120 (Discovery/34) |
15h.38m.19s. Oct 23, 2007 |
MS | STS-120 (Discovery/34) |
18h.02m.13s. Nov 07, 2007 |
15d.02h.23m.54s. |
2 | Soyuz-TMA19 | 15 Jun 2010 21h 35m |
FE ISS-24 |
Soyuz-TMA19 | 26 Nov 2010 04h 46m |
163d 07h 11m |
Total duration: | 178d 09h 34m 54s |
Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
26 Oct 2007 | 10:02 UT | 6h 14m | Wheelock and S.Parazynski; mission "STS-120". The 42nd EVA from airlock Quest. Retrieve and stow S-band Antenna Support Assembly, detach Node 2 ("Harmony") heater cables and remove cover from Node 2 aft berthing mechanism, stow grapple fixture on Node 2, disconnect Z1/P6 truss fluid lines, install shrouds on P6 radiator and Sequential Shunt Unit, move and attach Node 2 to Node 1 left-hand docking port with Station robotic arm, pressurise area between Node 1 and Node 2 hatches, perform leak check, open Node 1 hatch |
30 Oct 2007 | 09:45 UT | 7h 08m | Wheelock and S.Parazynski; mission "STS-120". The 44th EVA from airlock Quest. During this EVA the astronauts bolt P6 truss to P5 truss, attached P5 to P6 cabling, removed P6 radiator restraint and cover on Sequential Shunt unit and deploy radiator, configured squib firing unit on P1 truss, relocated main Bus Switching Unit from the Shuttle Cargo Bay to External Stowage Platform 2. |
03 Nov 2007 | 10:03 UT | 7h 19m | Wheelock and S.Parazynski; mission "STS-120". The 45th EVA from airlock Quest. Attaching cufflink-like clips across the 15-foot width of the torn P6-4B solar array blanket to provide the strength needed to permit its full extension. This dramatic repair job was carried out successful. |
Total: | 20h 41m | EVAs: 3 |
No. | Mission | Description | Date |
1 | Soyuz TMA-17 | FE | Dec 2009 |