Massimino

Michael James

USA


International order n°: 414

US astr. n°: 262


Personal data:

Birthdate:  19 Aug 1962
Birthplace:  Oceanside / New York
Marital status:  married
Children:  two
Selection date:  01 May 1996
Selection group:  NASA-16
Job:  MSP
Status:  Ret. Mar 2012

Spaceflights:

Startup
spacecraft
Date and time
launch (UT)
Status while
launch
Spacecraft
of landing
Date and time
landing (UT)
Duration
1 STS-109
(Columbia/27)
11h.22m.02s.
Mar 01, 2002
MS STS-109
(Columbia/27)
09h.33m.11s.
Mar 12, 2002
10d.22h.11m.09s.
2 STS-125
(Atlantis/30)
11 May 2009
18h. 01m.
MSP STS-125
(Atlantis/30)
24 May 2009
15h. 39m.
12d.21h.38m.
Total duration: 23d.19h.49m.09s.


EVA's:

Date of
beginning
Time of
beginning
Duration Crew & Remarks
05 Mar 2002 06:40 UT 7h 17m Massimino and J.Newman; mission "STS-109"
Installing the new port-side array and replacing one of the four Reaction Wheel Assemblies
07 Mar 2002 09:00 UT 7h 18m Massimino and J.Newman; mission "STS-109"
Changing the Faint Object Camera (FOC) with the Advanced Camera for Surveys (ACS) and installing a new electronic support module für the NICMOS Cryo Cooler
15 May 2009 - UT 7h 56m Massimino and M.Good; mission "STS-125"
Changing out three boxes, each containing two of the telescope′s six gyroscopes, and three batteries.
17 May 2009 - UT 8h 02m Massimino and M.Good; mission "STS-125"
Repairing and upgrade the Space Telescope Imaging Spectrograph, which stopped working in 2004 due to power failures, and install a stainless steel blanket on Hubble′s exterior. The blankets provide additional thermal protection for some equipment bays, replacing the existing multi-layer insulation that has degraded over time.
Total: 30h 32m EVAs: 4

Additional information


Ref: #16, #21 - update: 08.05.18