MassiminoMichael James |
USA |
International order n°: 414 |
US astr. n°: 262 |
|
N° | Startup spacecraft |
Date and time launch (UT) |
Status while launch |
Spacecraft of landing |
Date and time
landing (UT) |
Duration |
1 | STS-109 (Columbia/27) |
11h.22m.02s. Mar 01, 2002 |
MS | STS-109 (Columbia/27) |
09h.33m.11s. Mar 12, 2002 |
10d.22h.11m.09s. |
2 | STS-125 (Atlantis/30) |
11 May 2009 18h. 01m. |
MSP | STS-125 (Atlantis/30) |
24 May 2009 15h. 39m. |
12d.21h.38m. |
Total duration: | 23d.19h.49m.09s. |
Date of beginning |
Time of beginning |
Duration | Crew & Remarks |
05 Mar 2002 | 06:40 UT | 7h 17m | Massimino and J.Newman; mission "STS-109" Installing the new port-side array and replacing one of the four Reaction Wheel Assemblies |
07 Mar 2002 | 09:00 UT | 7h 18m | Massimino and J.Newman; mission "STS-109" Changing the Faint Object Camera (FOC) with the Advanced Camera for Surveys (ACS) and installing a new electronic support module für the NICMOS Cryo Cooler |
15 May 2009 | - UT | 7h 56m | Massimino and M.Good; mission "STS-125" Changing out three boxes, each containing two of the telescope′s six gyroscopes, and three batteries. |
17 May 2009 | - UT | 8h 02m | Massimino and M.Good; mission "STS-125" Repairing and upgrade the Space Telescope Imaging Spectrograph, which stopped working in 2004 due to power failures, and install a stainless steel blanket on Hubble′s exterior. The blankets provide additional thermal protection for some equipment bays, replacing the existing multi-layer insulation that has degraded over time. |
Total: | 30h 32m | EVAs: 4 |